This is coming completely out of order but we hadn’t realized it wasn’t posted yet.

With most of the work done behind the walls it was time for carpentry.  This is the task I’m most comfortable with.  Because of that comfort I was willing to challenge myself and do something different.  But before that, we needed a plan.

The original floor plan was awkward and tight.  Speaking of awkward, it has just occurred to me after misspelling the word 3 times that it is an awkward word to spell.  We will be living in this trailer for at least the next 6 months, and maybe longer.  It needs to feel spacious.  It needs to function.  It needs to have kennel space for 4 dogs.  We need to be able to move about comfortably and pass each other without having to reverse into a more open area to do so.  Only 2 of our dogs reverse well.  At the same time, it needs to maximize storage.  So how do we achieve all that in a 190 square foot space?  Some things are sacrificed, that’s how.  Using Google Sketchup we laid out a few different plans that included a small dining table as well as a couch/day bed in addition to a queen size bed, large kitchen and large bathroom.

fb_img_1516302161852142531005.jpg

With a plan we felt confident with we began.  I didn’t touch on this in the previous post, but it’s work that happened during the demolition stage, prior to the spray foam.  Most of the electrical components for the solar setup had arrived, including 3 massive panels.  38 ¾” by 79” to be precise.  These were selected without much planning.  We wanted to maximize our energy production without it being obvious we are driving a rolling power plant.  I knew we could fit 3 and no way could we fit 4.  As it turns out we couldn’t quite fit 3.  Not without making some changes that is.  The trailer had 3 roof vents on it; one in the bathroom with a broken fan and broken cover, one in the middle with a broken cover and damaged operating hardware, and one at the front with a broken cover.  The only way 3 panels were fitting up there is if we went down to 2 roof vents and moved one of them.  But that wasn’t all there was to do with regards to the roof.  Various brackets, antennas, satellite dish and other random items were fixed to the roof of the years and served no purpose other than to create work removing them.  For 3 days I drilled rivets out, removed screws, removed all the junk, patched holes, replaced damaged sheet aluminum, eliminated two vents, replaced one vent, and cut in a new hole to install a new vent in the kitchen area.  Being the only roof vent outside the bathroom, and without air conditioning, we put a 10 speed, 2 way fan in this location.  By the end of it I had patched 17 different locations on the roof, drilled out at least 300 rivets and installed close to 500.  I purchased a pneumatic rivet gun for this and it has got to be one of the most worthwhile tools I have ever bought.  I couldn’t imagine using a hand operated riveting tool for all of this.  I’d probably still be doing it between stints of physio for all sorts of issues I no doubt would have.

For the solar panel mounting I opted not to use the small brackets that were supplied and went about a bit different route.  I had concerns with the brackets for a few reasons.  The first of which was that they were meant to mount the panels on a wall or roof that isn’t going 120km/h down the road.  Secondly, I didn’t want the panels to be visible chunks on the roof of a fairly Streamline(d) trailer (see what I did there?).  I chose to run 3/16” wall, 3” aluminium angle front to back on either side to act as a sort of saddle for the panels to mount between.  To deal with water shedding, at each point of the shell frame that the trailer was bolted into I used a small piece of ¼” flat bar to act as a stand-off and effectively raise the channel that much from the surface of the roof.  One un-planned benefit of the 3” angle was that it provided some roof-line rigidity that helped to take out some hefty dents at a few bent wall/roof frame members.

Now back to the inside

I’d recently worked with cherry wood for a renovation project and really like the way it looked.  It has some beautiful marbling in it and the natural color demands nothing more than a clear varnish finish.  Having relationships at hardwood wholesalers made it an actual affordable option too.  I did some rough estimating on what would be required and went shopping.  The main ingredients for the build are 8/4 and 4/4 rough sawn cherry wood (mostly 8’-10’ lengths), ¼” cherry mdf core, 5/8” cherry particle core, ½” pre-finished poplar ply, 5/8” fir ply, 1/8” puck or rink board and .040 aluminium sheet.

The ceiling seemed like the logical place to start.  With roughly 38” of flat width before it starts to curve down to the walls we agreed that would be a nice place to run some cherry wood and break up the sea of white puck board that will be the walls.  Now when it comes to woodwork I can be a bit obsessive in the details.  And it started here.  The easy thing would have been to put up 40” wide sheets of cherry, 3 of them, and cover the seams.  But with our open plan in mind you would be able to see from front to back at once, so the ceiling needed to flow.  That is, the pattern of wood had to be consistent.  The sheets of ¼” had a repeating pattern on them which allowed one sheet to cut down into three identical strips.  What we have is 3 strips, a 14” (middle strip) and two 12” outer strips.  With it all cut and dry-fit it was back into the shop to spray it all prior to final installation.  3 coats of a satin finish, water based lacquer and it was time to install!

fb_img_15163019273801719636926.jpg

With ceiling panels on we could now begin to move down the walls.  We started with puck board butting into our ceiling edge and flexed it into the curved upper portion of the walls, securing it to the framework with rivets.  It remained quite rigid due to being pressed into the curve, so it only required fastening at the edges and maintained shape well.  This is nice because it means no visible rivets after all the seams were covered.  The install of the puck board is a 2-3 person job.  A good friend of mine, Spencer, was happy to help.  Like moving though, I provided the beer.  Piece after painstaking piece, we slowly worked our way back to the spot that the bathroom wall would be and down to the floor.

 

fb_img_15163019369281648945734.jpg

20171010_12405396446970.jpg20171010_124111555792076.jpg

With the walls done, it was time for the daunting part – the upper cabinet at the front of the trailer.  The old aluminum cabinet that was removed was not suitable for re-use.  Something new had to be made to fit into a curved roof and a curved front wall.  First thing was templating the curves.  I tried to trace out from the old cabinet onto cardboard but without being installed the old aluminum was too flexible and did not provide and accurate template.  A few hours later I had traced and trimmed and marked and trimmed and screwed up and started over, tracing and trimming, until I had tow templates that were a close enough fit to work off.  Another day later I had a cabinet box 80% built, ready to fit.  And fit it did, surprisingly well!  Now we could finish the cabinet (built out of the light ½” poplar ply) by gluing on ¼” cherry to the visible front and bottom, cut open some additional small storage spaces, and spray it.  Of course, mistakes were made, and we cut in the access to additional storage in the bottom of it.  The price of long days.  I still blame Spencer on this one because had he not been helping I wouldn’t have had the extra beer or two that evening prior to cutting holes in the wrong spot.  Fortunately, it was an easy fix.  Upon correction we figured it best to call it a night.

20171015_1716461507075184.jpg

The balance of the front area cabinetry went without many hiccups.  The bed frame, speaker boxes, and additional storage went together well.  Onto the rest.  The front closet I was dreading.  It was more cabinetry that had to fit into a curved wall.  I had picked up some steel studs that I planned on using for the bathroom wall a few weeks earlier.  After tripping on and knocking them over numerous times I finally had a use for them!  I used them to template the curve (which I should have done for the front cabinet) by cutting relief cuts every two inches from the point at which the wall begins to curve, to the end.  This allowed me to press the now flexible steel stud into the curve of the wall.  With a few pieces of lumber screwed in to brace and hold the curve I now had a very accurate template to trace onto my plywood.  It worked perfectly!

With the front closet built we took a step back and looked at our plans.  What looks great on paper doesn’t always execute the way you’d hope.  There was no way we could fit the kennel space and a day bed/couch.  So goodbye day bed.  The balance of cabinetry went without fuss.  I installed our new water tank centered over the axles and tight to the wheel well, which were insulated using 1” rigid foam insulation, glued down and taped at seams.  The batteries would sit in the same position on the opposite side.  The cabinet boxes were built, lacquered and installed, waiting for countertops to complete.

fb_img_15163025931731747761043.jpg

 

fb_img_15163023832871958023680.jpg

On the opposite side we built 2 kennels as one structure with 2” x 2” solid cherry making the frame.  Puck board acted as walls, with vinyl lattice for sliding doors, sitting in track cut into the framework prior to assembly.  More lacquer.  The remaining space would allow for an extra large removable kennel.  We though it would have been nice to have another built in one, but having the flexibility with the space matters more.

fb_img_1516301961031581947260.jpg

 

Now for the reading room, er, bathroom…

fb_img_15163020390181413644011.jpg

This was a challenge.  Our original idea was to have this be what is known as a wet room.  Meaning the entire space can get wet and drains to a central location.  Picture a spa type bathroom or that of your local gym.  We had the idea based on our experiences in Bali, Indonesia where it seemed every bathroom was built in such a way it could simply be blasted with a pressure washer to clean everything.  In a perfect setup you could properly shower while sitting on the toilet, not that you’d ever need to…  Unfortunately, due to the location of the black water holding tank it did not allow for a central drain that was easily sloped to.  This meant the floor drain could only easily be a shower drain offset to one side where the shower was to be.  So, with that in mind, and to maximize our shower space to be comfortable to use, we had a local stainless steel fabrication shop create a custom shower pan with a curb and lip all around it to fit into the rear corner of the trailer.  This allowed us to enclose the remainder of the bathroom walls, as well as the shower walls with .040 aluminium.  More sheet stainless would have been preferred due to its scratch resistant characteristics but cost, and more so workability was a major deterrent and pushed us towards the aluminium walls.  The aluminium was easily scored, cut and bent without the need of a pneumatic shear or hydraulic break.  That’s not to say it was easy.  It was not.  Just when I thought I had things figured out did it become glaringly apparent I didn’t.  Not at all.  The corners were an absolute nightmare.  And I’m still not happy with how they turned out.  The reading room is probably the first place (and was the last place to finish) that I started to say “good enough” as we were getting deeper into Canadian winter and needed to hit the damn road and start this adventure!  There are still a few little finishing details remaining that need attention, but we have yet to hit warm enough temperatures to be able to actually use the water systems.  So in the words of a good friend of mine, “problem for tomorrow!”

Trailer is done enough, time to go! (still some electrical and plumbing details I haven’t covered, but those are a bit more technical and will require a more in depth post that will put all but the most interested readers to sleep)…

One thought on “Soon the fun begins

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s